ASIC Signoff
ASIC Signoff Checks Before Tapeout
A disciplined ASIC signoff checklist covering static timing, physical verification, power and IR drop, reliability, and functional evidence before tapeout.
Frequently Asked Questions
What is ASIC signoff?+
ASIC signoff is the final verification phase where a design is proven ready for fabrication using tool-generated evidence across timing, physical verification, power integrity, reliability, and functional equivalence. Every check runs on the final netlist and layout so the results describe exactly what will be manufactured.
Which signoff checks should run last?+
The final sweep should be ordered so that each check runs on the truly final database. In practice, physical verification and final static timing with extracted parasitics run late, with functional equivalence confirmed on the final netlist. The key rule is that any layout or netlist edit after a signoff run invalidates that run.
What makes a waiver acceptable in signoff?+
An acceptable waiver has a documented technical reason, a named owner, a scope limited to specific instances or layers, and an explicit approval recorded before tapeout. Waivers without owners or reasons become inherited risk when a design is reused in a later project.
How do teams keep signoff results reproducible?+
By archiving the exact inputs of every final run: the netlist, layout database, constraints, library and process design kit versions, parasitic extraction data, and tool versions. Ideally a script regenerates each result from those inputs, so the signoff record can be audited or rerun months after tapeout.